Remote Powering

Many thanks to Schneider for allowing me to present at their consultancy breakfast in Perth this week.

It was great to see the industry in Western Australia actively start to look at how to address the issues around remote powering.

The assessment requirement to determine maximum length of permanent links and channel affected by heat rise in the cable bundles seem to draw the most interest and gave me a chance to run VTI Services modelling tool which is still under development.

© 2018 VTI Services | ABN 18 060 154 421 | Phone +61 2 9824 2412Site design by Codfish Design | Development, CMS and Data Processing by Behind the Page