Client Login
Home
About
Technical Notes
UTP Testing
Fibre Testing
Services
Check-IT
Test-IT
Inspect-IT
Spec-IT
NATA
Fibre Calculator
Downloads
Useful Links
Contact
Fibre Calculator
Optical Attenuation and Propagation Delay Calculator
for AS/NZS ISO/IEC 14763.3 :2007
Cable Length (m)
Number of End Connectors
2
Additional connectors
(Other than the end connectors)
Number of Splices
Optical attenuation allowance for link components
850nm
1300nm
1310nm
1550nm
Allowance for the two end connectors
0.60dB
0.60dB
1.00dB
1.00dB
Allowance for any additional connectors
Allowance for splices
Allowance for cable
Total Optical Attenuation Budget for a Link
Propagation Delay
Notes:
These figures reflect requirements of AS/NZS ISO/IEC14763.3:2007
These figures are based on 1. utilising a Light Source or Light source and associated mandrel that produces the correct modal launch conditions 2. utilising test cords with reference connectors that meet the current standard 3. Utilising either a one or three patch cord referencing method
Site design by
Codfish Design
| Developement, CMS and Data Processing by
Behind the Page